- Site Area: 1620 m2
- Retained Area: 3200 m2
- Excavation Depth: 16 m
- none
- none
Farhang Complex Project
- Sari
In these days, following growth in construction of new buildings and urban infrastructures, the demand for deeper cut in urban area has been increased. The design and construction of excavation support systems can be complex due to the ,soil structure, depth of excavation groundwater table, dynamic loads and adjacent structures. ABRAND designs and constructs the optimal deep excavation support system solution that achieves project requirements, such as soil nail walls, ground anchors soldier piles and bracing struts.